Knittens
02-24-2006, 07:31 PM
I'm working socks with a Sherman heel and I've gotten half way then I hit the enchoachments. It says : P enc (purl encroachment): sl 1 st purlwise; lift st beneath next stitch purlwise; insert L needle into both st from L, behind R needle;
P 2 tog.
K enc (knit encroachment): sl 1 st knitwise; lift st beneath next stitch purlwise; insert L needle into both st from L, in front of R needle;
K2 tog.
I can't figure out where to lift the stitches from and with which needle and what needle I put it on. Sorry if I sound a bit dense, but I can't figure it out.
Thanks! Here's a link http://www.knitlist.com/2002/ToeUpSock.htm
P 2 tog.
K enc (knit encroachment): sl 1 st knitwise; lift st beneath next stitch purlwise; insert L needle into both st from L, in front of R needle;
K2 tog.
I can't figure out where to lift the stitches from and with which needle and what needle I put it on. Sorry if I sound a bit dense, but I can't figure it out.
Thanks! Here's a link http://www.knitlist.com/2002/ToeUpSock.htm