View Single Post
Old 01-29-2009, 08:19 PM   #50
ArtLady1981
Moderator
Mod Squad
 
ArtLady1981's Avatar
 
Join Date: Aug 2006
Location: Kent, Washington
Posts: 10,473
Thanks: 5,264
Thanked 3,893 Times in 3,014 Posts
Originally Posted by GinnyG View Post
Got gauge! Lambs Pride Bulky with size 10 needle!

Started the cuff........

Artlady have you started the sleeve? I think I am confused about overlapping and sewing before picking up stitches. Back stitch??

The pattern doesn't have a good picture of the cuff.
There is a cuff diagram from the designer. She posted a rough diagram over at Rav for someone.


No, haven't cast on yet. Feb 1st. I'll have more input about the cuffs after I cast on for them.

Am finishing up John's Jacket. Seaming all done, and currently in the process of knitting the collar. Next: installing the zipper, and slip-stitching the pocket linings in the inside!

The LOG CABIN stashghans for the January KH-KAL took a lot of my time away from John's Jacket...so I am really focusing on getting it done before SYLVI. I did allow myself the luxury of color-coding my charts though! I totally enjoyed that! And I got my folder prepared. But the actual knitting will have to wait til Feb 1st unless I get his jacket done tonight! I hope I do! But, it depends on how fussy and time-consuming the zipper is! Ach.
__________________
Knitting Help Video Index

Artlady at Rav

Last edited by ArtLady1981 : 03-16-2009 at 04:55 AM.
ArtLady1981 is online now   Reply With Quote
The Following User Says Thank You to ArtLady1981 For This Useful Post:
Marria (02-02-2009)