View Single Post
Old 12-02-2011, 01:04 PM   #7
chie
Casting On
 
Join Date: Nov 2011
Posts: 3
Thanks: 4
Thanked 0 Times in 0 Posts
hi,here is the partern.


SPECIAL ABBREVIATIONS
C4F: Sl 2 sts to cable needle, hold at front of work, K2, K2 from cable needle.
C4B: Sl 2 sts to cable needle, hold at back of work, K2, K2 from cable needle

Men's Mitt Cable Pattern (Panel of 21 sts)
Row 1 (RS): P2, K8, P1, K8, P2.
Row 2 (and all even rows): K2, P8, K1, P8, K2.
Row 3: Rep Row 1.
Row 5: P2, C4F, K4, P1, K4, C4B, P2.
Row 7: P2, K2, C4F, K2, P1, K2, C4B, K2, P2.
Row 9: P2, K4, C4F, P1, C4B, K4, P2.
Row 10: K2, P8, K1, P8, K2.
Rep Rows 1-10 for Stag Horn Cable patt.

SPECIAL TECHNIQUES
Built in I-Cord (RS rows): K2.
Built in I-Cord (WS rows): Sl 2 pwise wyif.

Follow this, for the built I cord right side, i knitted 2 stiches to the cable needle and then slipped them back. Last I put 2 stiches on to the cable needles one more time. , Is it right or not?



MEN'S MITTS
Left Mitt: With straight needles, cast on 46 sts.
Row 1 (WS): P2, K2, P8, K1, P8, K2, P2, K19, P2.
Row 2: Work 2 sts in Built in I-Cord (RS), P19, work 2 sts in Built in I-Cord (RS), work Row 1
of men's mitt patt chart across 21 sts, work 2 sts in Built in I-Cord (RS).
Row 3: Work 2 sts in Built in I-Cord (WS), work row 2 of chart across 21 sts, work 2 sts in
Built in I-Cord (WS), K19, work 2 sts in Built in I-Cord (WS).
Work even in patt as set until piece measures 2" from beg, ending after a WS row.

A.piture of the mittens . thank u for ur help
http://www.knittinghelp.com/forum/at...1&d=1322845026
Attached Thumbnails:
Click image for larger version

Name:	miitens.JPG
Views:	118
Size:	78.9 KB
ID:	55563  
chie is offline   Reply With Quote