View Single Post
Old 11-12-2013, 05:55 PM   #6
GrumpyGramma
2nd Sock, I Rock
 
GrumpyGramma's Avatar
 
Join Date: Jul 2011
Posts: 9,250
Thanks: 2,257
Thanked 3,503 Times in 2,970 Posts
Quote:
Row 5: K1, SSK, knit to last 3 sts, k2tog, k1: 25 (27, 29) sts.
Is that where you are? Before that you're instructed to work on the sleeve stitches only and in that case the number would be how many stitches you should now have on the needle.

Quote:
Work back & forth
on these left sleeve sts only until length from point if division is 3 (4, 4), ending with a WS
row.
I don't see where it would change from being only the sleeve stitches that are being worked.
__________________
~ GG

I should never overestimate my basic arithmetic skills.


Quote:
Cheating is an option. . . . Cheaters never win and winners never cheat, but smart knitters who want to retain an iota of sanity do, cheerfully. ~~Kory Stamper
GrumpyGramma is online now   Reply With Quote