Hi!
FINALLY DONE! I finally finished the August Knitting Challenge: Cables. Why so long to finish?? I was so bored with all the st st in this pattern that every time I finished a piece or two...I took "knitting side trips".

You know...other projects!

About a dozen!
Anyhoo, here she is, along with a cami-tank to match. I had extra yarn, and needed a top to wear with BORGHILD. Designed the cami-tank myself, using Elsebeth Lavold's cable design (as seen in the cardigan) for the chestband. I seamed the band, then picked up stitches along its edge, and knit in-the-round down to the bottom, with some shaping along the way, finishing off with little K1 P1 ribbing to pull it in. Sounds easy, eh? Not so. I knit and re-knit everything about this little cami-tank...however, it wasn't boring! Just tedious! So much for design work. Emphasis on the word "WORK"!
