Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 12-12-2011, 02:34 PM   #1
Northknitter
1st Leg of the Journey
 
Join Date: Jan 2006
Location: Ontario Canada
Posts: 245
Thanks: 83
Thanked 20 Times in 8 Posts
Drops calendar 2011
As always they have lovely patterns, I am thinking of knitting the pot holder with 3 snowmen...the chart repeat I am not quite understanding... the graph shows a space between the outer border the the snowmen.
POT HOLDER:
Worked in the round on circular needle. Cast on 74 sts on circular needle size 4 mm with off white. Insert 1 marker in the 1st st at beg of round and 1 marker in the 38th st (= side edges). Continue to work as follows: * 1 time diagram M.1A, 3 times diagram M.1B *, repeat from *-* a total of 2 times. Continue until diagram M.1A and M.1B have been worked 1 time vertically. Cast off with off white. Embroider French knots with black where there is a star in the diagram. Fold the pot holder so that the sts with markers are in the sides.
Attached Thumbnails:
Click image for larger version

Name:	drops 2011.jpg
Views:	61
Size:	93.9 KB
ID:	55585  
Northknitter is offline   Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
DROPS 2011 Advent calendar is up! Becky Morgan Pattern Central 1 11-06-2011 12:33 PM
DROPS Advent calendar is up! Becky Morgan Pattern Central 1 12-02-2009 09:26 PM
Drops Easter workshop calendar is up katknit Pattern Central 1 03-25-2009 09:24 PM
Drops Christmas Calendar mhansen General Knitting 4 12-20-2008 02:04 PM
Fun! Garnstudio-DROPS Christmas Calendar janettle General Knitting 15 12-02-2007 07:59 AM

All times are GMT -4. The time now is 02:36 AM.