Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 04-05-2005, 12:03 AM   #1
Miss Suzie
Ribbing the Cuff
 
Join Date: Apr 2005
Location: Tigard, Oregon
Posts: 27
Thanks: 0
Thanked 0 Times in 0 Posts
Working into the cross loop (K1 tbl, k1, k1 tbl,k1)
Im working on my first cardigan (sweater) and the istructions reads:

work 4 into cross loop before foll st (=k1 tbl, k1, k1 tbl, k1).

Ok, I understand how to how to work one into the cross loop but 4 into cross loop I am not sure of. Lets see if I got this right.

Pick up the cross loop with left needle and knitt one through the yarn in the back of that loop,with out moving the loop over to the other needle I continue by knitting one in the front of the same loop that I had picked up then move it to the other needle. That would be k1 tbl, k1, right??

This next step is where I get a little comfused ok ok a lot confused!

Next, I pick up the cross loop once again and start over. Or, do I continue knitting through the same loops over again until a total of 4 has been knitted?? Oh boy this is a doozie for me I have a big mess on my hands and I have pulled this one out 5 or 6 times, I have been Banging Head Against Wall on this one...HELP PLEASE
__________________
"Knitting for Sanity"
Miss Suzie is offline   Reply With Quote
 


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Left Cross Stitch/Right Cross Stitch momathome2 How-to Questions 9 01-29-2011 06:33 PM
Help! The working yarn is coming from the 2nd loop. boo1 General Knitting 2 12-02-2007 12:17 AM
With Magic Loop Knitting, are we always working at the front of the work? hypeforlife91 How-to Questions 3 11-28-2007 09:59 PM
LCS (left cross stitch) and RCS (right cross stitch) sop 1 How-to Questions 9 10-26-2007 07:00 PM
Working into the cross loop? k1 tbl, k1, k1 tbl, k1 Miss Suzie How-to Questions 6 04-06-2005 06:54 PM

All times are GMT -4. The time now is 12:36 PM.