|
help w/pattern
i am trying to knit a bernat super value long cable vest. i followed the directions to form the irish moss st pat i followed the four rows and in each go to tch row it told me to go to the diamond panel pat which has 30 rows. so i knit 1st row and then it tells me to work 1st row diamond panel so i do that for the first four rows. what i was doing then was repeat the four rows which form the irish moss pat, but instead i would repace the ro |