What does sl 1 mean. Have to do this every 15 purl stitches. I think (not sure) I am suppose to slip stitch from left needle to right needle, then purl next stitch on left needle to right needle then slip the stitch in front of purl stitch over purl stitch off right needle. Is this correct?
